Larger Animation: NCEP Ensemble 850 mb Temperature Mean Anomaly ( > 2 Std. Dev. )

Latest Plots for NCEP Ensemble Model Run: 2024/10/07 were updated on Monday, October 07 20:26 UTC


Frame Controls: Imagery:
Loop Mode:
Normal Back and Forth

Animate Frames:
REV STOP FWD

Dwell First:
dec start dwell inc start dwell
Dwell Last:
dec end dwell inc end dwell

Adjust Speed:
-- ++

Advance One:
-1 +1
Frame No:
NCEP Ensemble 850 mb Temperature Mean Anomaly ( > 2 Std. Dev. )


Back to the SMALLER MOVIE of the 850 mb Temperature Anomaly Probability ( > 2 Std. Dev. )


Return to NCEP Ensemble Main Page