Site Status
Site Status (for sites maintained by PSL) |
Saturday 20th of April 2024 9:39:25 UTC |
Number of Open Entries: 6 |
FailureID | SiteID | Site Name | State | Failure Type | Start Date | End Date | Failure Description | Resolution Description |
900 | pts | Point Sur | CA | Power Failure | 2024-02-19 06:00:00 | One of three phases of site power is down; utility notified | ||
908 | cff | Colfax(FMCW) | CA | Power Failure | 2024-03-25 16:00:00 | Power outage due to construction at site | ||
909 | cfc | Colfax | CA | Power Failure | 2024-03-25 16:00:00 | Power outage due to construction at site | ||
875 | tci | Twitchell Island | CA | Hardware - Instrument | 2023-08-17 21:30:00 | Radar antenna malfunction | ||
885 | ner | New Exchequer Dam | CA | Hardware - Instrument | 2023-11-01 21:45:00 | Radar electronics malfunction | ||
911 | oth | North Bend | OR | Hardware - Instrument | 2024-04-14 11:58:00 | Unable to connect to datalogger; possible data cable/connector issue |